TTM Group AB Ring Arc Welding Fixtures/jigs- BX755(19018)

This is a welding fixtures which will be used to AB Ring
This is a welding fixtures we made for our Canada customer.
 


Product Detail

Product Tags

Video

Function

For AB Ring quality inspection control and support to improve the automotive production line capacity rate

Specification

Fixture Type: Arc Welding  
Size: 2130 x 680 x 970mm 
Weight:  1320KG 

 

Detailed Introduction

This is a batch of welding fixture of AB Ring , totally in 15 sets, we made for our Canada customer. Welding production line variety, small batch and short cycle are the main characteristics of modern machinery manufacturing industry. The appearance of this feature promotes the creation of the concept of flexible fixture and the development of technology. As the cycle of product renewal is getting shorter and shorter, how to quickly switch from old models to new models and shorten the project cycle is the research direction of each gems.

Welding fixture mainly includes fixture bottom plate, clamp specific, auxiliary mechanism, control system several parts. The bottom plate is the chassis of fixture components, automatic welding gun, lifter and other fixture components. It is the basic component of welding fixture, and its accuracy directly affects the accuracy of positioning mechanism.Circular seam automatic welding machine is a kind of universal automatic welding equipment that can complete all kinds of circular and annular welds. Can be used for carbon steel, low alloy steel, stainless steel, aluminum and its alloy and other materials of high quality welding, and can choose argon arc welding (wire or not wire), melting electrode gas welding, plasma welding and other welding power to form a ring seam automatic welding system.It can be widely used in the welding of hydraulic cylinder, automobile direction frame, drive shaft, gas storage cylinder, chemical and medical containers, liquefied gas tanks, fire fighting equipment, rollers and liquid storage cylinder for mining and production lines, etc.

2x

The working flow

Received the purchasing order->Design->Confirming the drawing/solutions-> Prepare the materials->CNC-->CMM--> assembling--> CMM-->Inspecting--> (3rd parts inspections if need)-> Package(with wooden)-->delivery

Lead time & Packing

30 days after 3D design approved
5 days via express: FedEx by Air
Standard Export Wooden Case


  • Previous:
  • Next: