Short Lead Time for Spot Welding Fixture - AB Ring Arc Welding Fixtures/jigs- BX755(19018) – TTM


Product Detail

Product Tags

Related Video

Feedback (2)

We always follow the principle "Quality Very first, Prestige Supreme". We have been fully committed to delivering our customers with competitively priced high-quality products and solutions, prompt delivery and experienced services for Trunk Welding Fixture, Cnc Machining Aerospace Parts, Arc Welding Fixture, Good quality would be the key factor to the company to stand out from other competitors. Seeing is Believing, want far more info? Just trial on its items!
Short Lead Time for Spot Welding Fixture - AB Ring Arc Welding Fixtures/jigs- BX755(19018) – TTM Detail:

Function

For AB Ring quality inspection control and support to improve the automotive production line capacity rate.

Specification

Fixture Type:

Arc Welding

Size:

1800x1300x900mm

Weight:

115KG

Product Details

Detailed Introduction

This is a batch of welding fixture of AB Ring , totally in 15 sets, we made for our Canada customer. Welding production line variety, small batch and short cycle are the main characteristics of modern machinery manufacturing industry. The appearance of this feature promotes the creation of the concept of flexible fixture and the development of technology. As the cycle of product renewal is getting shorter and shorter, how to quickly switch from old models to new models and shorten the project cycle is the research direction of each gems.

Welding fixture mainly includes fixture bottom plate, clamp specific, auxiliary mechanism, control system several parts. The bottom plate is the chassis of fixture components, automatic welding gun, lifter and other fixture components. It is the basic component of welding fixture, and its accuracy directly affects the accuracy of positioning mechanism.Circular seam automatic welding machine is a kind of universal automatic welding equipment that can complete all kinds of circular and annular welds. Can be used for carbon steel, low alloy steel, stainless steel, aluminum and its alloy and other materials of high quality welding, and can choose argon arc welding (wire or not wire), melting electrode gas welding, plasma welding and other welding power to form a ring seam automatic welding system.It can be widely used in the welding of hydraulic cylinder, automobile direction frame, drive shaft, gas storage cylinder, chemical and medical containers, liquefied gas tanks, fire fighting equipment, rollers and liquid storage cylinder for mining and production lines, etc.

The Working Flow

1. Received the purchasing order -——-> 2. Design -——-> 3. Confirming the drawing/solutions -——-> 4. Prepare the materials -——-> 5. CNC -——-> 6. CMM -——-> 6. Assembling -——-> 7. CMM-> 8. Inspection -——-> 9. (3rd part inspection if need) -——-> 10. (internal/customer on site) -——-> 11. Packing(wooden box) -——-> 12. Delivery

Lead time & Packing

30 days after 3D design approved
5 days via express: FedEx by Air
Standard Export Wooden Case


Product detail pictures:

Short Lead Time for Spot Welding Fixture - AB Ring Arc Welding Fixtures/jigs- BX755(19018)  – TTM detail pictures

Short Lead Time for Spot Welding Fixture - AB Ring Arc Welding Fixtures/jigs- BX755(19018)  – TTM detail pictures

Short Lead Time for Spot Welding Fixture - AB Ring Arc Welding Fixtures/jigs- BX755(19018)  – TTM detail pictures

Short Lead Time for Spot Welding Fixture - AB Ring Arc Welding Fixtures/jigs- BX755(19018)  – TTM detail pictures


Related Product Guide:

We constantly function like a tangible group to ensure that we can give you the very best high-quality and also the very best cost for Short Lead Time for Spot Welding Fixture - AB Ring Arc Welding Fixtures/jigs- BX755(19018) – TTM , The product will supply to all over the world, such as: Roman, South Africa, Uzbekistan, Welcome to visit our company and factory, there are various products displayed in our showroom that will meet your expectation, meanwhile, if you are convenient to visit our website, our sales staff will try their efforts to provide you the best service
  • Goods just received, we are very satisfied, a very good supplier, hope to make persistent efforts to do better.
    5 Stars By Frederica from kazakhstan - 2017.07.07 13:00
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Gemma from Venezuela - 2017.10.25 15:53