8 Year Exporter Assembly Testing Equipment - Welding Fixture For Cross Member WS Spring Link – TTM


Product Detail

Product Tags

Related Video

Feedback (2)

Being supported by an advanced and specialist IT team, we could give technical support on pre-sales & after-sales services for Automated Tool, Automotive Fixture, Seat Assembly Checking Fixtures, Our firm quickly grew in size and reputation because of its absolute dedication to superior quality manufacturing, substantial price of solutions and fantastic customer services.
8 Year Exporter Assembly Testing Equipment - Welding Fixture For Cross Member WS Spring Link – TTM Detail:

Application Fields

Automotive industry quality control
Automotive production line production capacity improve

Specification

Fixture Type:

Arc Welding

Size:

1800x1300x900mm

Weight:

125KG

Material:

Main Construction: metal

Support: metal

Surface treatment:

Base Plate: Electroplating Chromium and Black Anodized

Product Details

Detailed Introduction

This is a batch of welding fixture of WL Cross Member WS Spring Link , totally in 2 sets, we made for our Canada customer.The spring chuck shank is a cylindrical fixture installed in a milling machine to imprison a drill or a milling cutter. Insert the chuck into the lock nut and gently screw the lock nut with the spring chuck onto the shank, connector or spindle. Depending on the elasticity of elastic steel to tighten, loose clamp convenient, mostly used for clamping light, medium load cutting tools. It is often used for clamping cutting tools such as end mills, drill bits, taps, reamers and center drills. Change the clamping range by changing the different collects.When clamping, the thread part of the spring chuck, lock nut and positioning surface and cone surface should be cleaned. During the installation of the chuck and lock nut, the chuck and lock nut must be tilted to a certain Angle and then placed into the lock slot of the lock nut. Do not use the extended powerful wrench torque is too tight, to prevent the meteorite bad tool and fixture.

The Working Flow

1. Received the purchasing order -——-> 2. Design -——-> 3. Confirming the drawing/solutions -——-> 4. Prepare the materials -——-> 5. CNC -——-> 6. CMM -——-> 6. Assembling -——-> 7. CMM-> 8. Inspection -——-> 9. (3rd part inspection if need) -——-> 10. (internal/customer on site) -——-> 11. Packing(wooden box) -——-> 12. Delivery

Manufacturing Tolerance

1. The Flatness of Base Plate 0.05/1000
2. The Thickness of Base Plate ±0.05mm
3. The Location Datum ±0.02mm
4. The Surface ±0.1mm
5. The Checking Pins and Holes ±0.05mm

Process

CNC Machining(Milling/Turning), Grinding
Electroplating Chromium and Black Anodized Treatment
Design Hours(h):40h
Build Hours(h):150h

Quality Control

CMM (3D Coordinate Measuring Machine), Vms-2515G 2D Projector, HR-150 A Hardness Tester
Third Party Certification done by ShenZhen Silver Basis Testing Technology Co., Ltd , ISO17025 Certified


Product detail pictures:

8 Year Exporter Assembly Testing Equipment - Welding Fixture For Cross Member WS Spring Link – TTM detail pictures

8 Year Exporter Assembly Testing Equipment - Welding Fixture For Cross Member WS Spring Link – TTM detail pictures


Related Product Guide:

abide by the contract", conforms into the market requirement, joins in the market competition by its good quality also as provides a lot more comprehensive and great company for purchasers to let them turn into huge winner. The pursue from the firm, would be the clients' gratification for 8 Year Exporter Assembly Testing Equipment - Welding Fixture For Cross Member WS Spring Link – TTM , The product will supply to all over the world, such as: Florence, Swiss, Hyderabad, We always adhere to follow the honesty, mutual benefit, common development, after years of development and the tireless efforts of all staff, now has perfect export system, diversified logistics solutions, thorough meet customer shipping, air transport, international express and logistics services. Elaborate one-stop sourcing platform for our customers!
  • Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Diana from Luxembourg - 2017.03.08 14:45
    Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Leona from Seattle - 2017.11.29 11:09